Description
Production scheduling is one of the most important research topics in the discipline of industrial engineering and management. The use of a flow shop model and optimization algorithm to find an optimum schedule with the lowest production cost is common. The approach begins with the collection of production data in order to have a better understanding of the production environment.This dataset contains information from a single bakery production line. It is slightly modified from the original production data. The hybrid no-wait flow shop scheduling concept is applicable for bakeries. There should be no delay between two successive stages. Furthermore, the products are grouped according to their internal dependencies. One product can be produced at any point during the manufacturing process of a group of products. The remainder of the products in the same group, however, are dependent on it.The parameters in this dataset are described in detail below.machine_id (M): The id for machinesmachine_name: The name of the corresponding machinemachine_category: Machines of the same functionality are identified, so that one of them can be chosen.employee_id (E): The id for employeesshift_start: The production time [min] when the shift of an employee startsshift_end: The production time [min] when the shift of an employee endspr_group(PG): Product group number, grouped based on internal dependency of the productsproduct_id (P): ID for the products within a groupbowl_time_WT (WT): Start time difference between independent product and another product of the groupproduct_name: Name of the productbatches: Number of batches of a group. If the value is 2 for a group, all the products in this group have to produce two times. However, 2 groups must not be produced at the same time or one after one. In other words, batches of same group do not depend on each other. Therefore, multiple batches can be produced independently. However, products withing a batch of a group must follow the bowl time (WT).stage_name: Name of the processing stagesduration_PT (PT): Processing time [min] for the stagesmachines_ employees_ME (M, E): Required machines or employees that can perform the task. Dough rest and cooling require no machines. For proofing no blockage is considered. It means proving chamber can operate as many product as possible to produce at a time. In such cases, the cells are kept empty. The term "Manual" indicates that the task has to performed by any employee.
Citations (0)
No citations found
Mentions (0)
No mentions found
Metrics Over Time
Publication Details
Subfield
Industrial and Manufacturing Engineering
Field
Engineering
Domain
Physical Sciences
Confidence Score
75%
Source
Open Alex