2016

Justin Survey 6 20160927 Tascam wav files

Barbastellus Barbastellus;Halls, Justin;Helm, Chantal

Description


Bayfordbury Survey
27 Sept 2016
19:00-21:00
Justin A T halls
TascamDR05 (static)
MEMS
cool, heavily overcast
Luton at 1950 17C 94% 1023hPa SSW 3.1m/s waning crescentSixth Bayfordbury survey of the year. Static detector (Tascam) on the logpile
just into the path that goes diagonally up to the clearings.
Usual route through the Pinetum, across to the railway track and then down that track and through
the wood to the memorial. Then back through the clearings and down the diagonal
track to collect the Tascam and back to the centre.

Citations (0)

Mentions (0)

Metrics

Dataset Index

0.5

FAIR Score

85%

Citations

0

Mentions

0

Metrics Over Time

Publication Details

DOI

Publisher

figshare

License

Creative Commons Attribution 4.0 International

Assigned Domain

Subfield

Archeology

Field

Arts and Humanities

Domain

Social Sciences

Confidence Score

100%

Source

Open Alex

Keywords

60299 Ecology not elsewhere classifiedFOS: Biological sciences

Normalization Factors

FT

57.69

CTw

1.00

MTw

1.00