Automated Author Profile

Albers, Anna

Karlsruhe Institute of Technology (KIT)
0000-0001-8449-3428

Current S-Index

2.5

Sum of Dataset Indices for all datasets

Average Dataset Index per Dataset

0.6

Average Dataset Index per dataset

Total Datasets

4

Total datasets for this author

Average FAIR Score

80.8%

Average FAIR Score per dataset

Total Citations

2

Total citations to the author's datasets

Total Mentions

0

Total mentions of the author's datasets

S-Index Interpretation

S-Index Over Time

Cumulative Citations Over Time

Cumulative Mentions Over Time

Datasets

Data set from 2nd May 2024 to 12 May 2024 of a heat extraction test on a planar trench collector

This data set provides two different temperature measurements (PT100 and thermistors), as well as the determination of the volumetric water content and the bulk electrical conductivity of the subsurface. During the observation period, heat was extracted at a rate of approximately -0.7 kW. Unfortunately, the compressor ceased operation despite continued requests from the control system on May 11th at around 18:50. Due to the presence of a buffer tank and the continued volume flow, the exact time of compressor failure cannot be determined. On May 2nd at 15:57, both fluid circulation and heat extraction were initiated. The test was conducted with a constant volume flow of 0.35 m³/h, which remained unchanged until the end of the data set.

Authors

  • Van de Ven, Adinda ;
  • Neth, Fabian ;
  • Köhler, Andreas ;
  • Buchmiller, Daniel ;
  • Volkmer, Stephan ;
  • Koenigsdorff, Roland ;
  • Albers, Anna ;
  • Steger, Hagen
0 Citations0 Mentions77% FAIR0.4 Dataset Index
10.5281/zenodo.154251792025

Data set from 2nd May 2024 to 12 May 2024 of a heat extraction test on a planar trench collector

This data set provides two different temperature measurements (PT100 and thermistors), as well as the determination of the volumetric water content and the bulk electrical conductivity of the subsurface. During the observation period, heat was extracted at a rate of approximately -0.7 kW. Unfortunately, the compressor ceased operation despite continued requests from the control system on May 11th at around 18:50. Due to the presence of a buffer tank and the continued volume flow, the exact time of compressor failure cannot be determined. On May 2nd at 15:57, both fluid circulation and heat extraction were initiated. The test was conducted with a constant volume flow of 0.35 m³/h, which remained unchanged until the end of the data set.

Authors

  • Van de Ven, Adinda ;
  • Neth, Fabian ;
  • Köhler, Andreas ;
  • Buchmiller, Daniel ;
  • Volkmer, Stephan ;
  • Koenigsdorff, Roland ;
  • Albers, Anna ;
  • Steger, Hagen
1 Citation0 Mentions77% FAIR0.7 Dataset Index
10.5281/zenodo.154251802025

Data set of a thermal response test on a planar trench collector

This data set provides three different temperature measurements (PT100, fiber optic measurement, thermistors), as well as the determination of the volumetric water content and the bulk electrical conductivity of the subsurface. During the published period, a thermal response test was carried out. On April 28th, at 15:25, the fluid circulation began, and heat injection started at 15:38 on April 28th and continued until May 3rd. The test was conducted with a constant volume flow of 1.00 m³/h and a constant heat injection rate of 0.88 kW.

Authors

  • Van de Ven, Adinda ;
  • Neth, Fabian ;
  • Köhler, Andreas ;
  • Buchmiller, Daniel ;
  • Volkmer, Stephan ;
  • Koenigsdorff, Roland ;
  • Albers, Anna ;
  • Steger, Hagen ;
  • Schindler, Linda ;
  • Zorn, Roman
0 Citations0 Mentions85% FAIR0.5 Dataset Index
10.5281/zenodo.140695772024

Data set of a thermal response test on a planar trench collector

This data set provides three different temperature measurements (PT100, fiber optic measurement, thermistors), as well as the determination of the volumetric water content and the bulk electrical conductivity of the subsurface. During the published period, a thermal response test was carried out. On April 28th, at 15:25, the fluid circulation began, and heat injection started at 15:38 on April 28th and continued until May 3rd. The test was conducted with a constant volume flow of 1.00 m³/h and a constant heat injection rate of 0.88 kW.

Authors

  • Van de Ven, Adinda ;
  • Neth, Fabian ;
  • Köhler, Andreas ;
  • Buchmiller, Daniel ;
  • Volkmer, Stephan ;
  • Koenigsdorff, Roland ;
  • Albers, Anna ;
  • Steger, Hagen ;
  • Schindler, Linda ;
  • Zorn, Roman
1 Citation0 Mentions85% FAIR0.9 Dataset Index
10.5281/zenodo.140695782024